Why did the customer contact us?

The customer was experiencing an issue with their drain line located beneath a concrete floor. An inspection revealed that the rubber hub gasket connecting the existing cast-iron piping was protruding into the pipe, indicating a problem with the connection that needed further attention.

Solutions provided:

Our plumbing team removed the existing toilet and opened the concrete floor to access the drain piping. Once the piping was fully exposed, we identified the necessary repairs and corrected the damaged drain line. We also had our drain technician clean the remaining sections of the drain line to remove years of accumulated buildup. After completing the repairs and cleaning, we reinstalled the existing toilet and restored the area to working order.

Team members on this project:

Jimmy, Will

Photos & Videos:

Repaired concrete floor
Large View Icon
Repaired concrete floor
Open concrete floor with exposed drain line
Large View Icon
Open concrete floor with exposed drain line
Plumbing technician clearing out concrete flooring to access drainline
Large View Icon
Plumbing technician clearing out concrete flooring to access drainline